SIQ – Relocation of the Centre Intégré MTQ & CGER
Specifications
Client: Société immobilière du Québec
Contract Value: 14 000 000$
Architect: Provencher Roy & Associés Architectes
Location: 5500, Pullman Blvd., Montréal, QC. H4C 1E4
Description
Construction of a 33 000 sq. ft. integrated centre regrouping the administrative spaces and services for the MTQ and CGER employees, as well as an extensive garage, a mechanical shop and a salt storage unit with a 2 000 ton capacity. The project qualified for LEED Silver building certification from the Canada Green Building Council as required by the specifications. Ecological characteristics include the installation of a geothermal heating / cooling system featuring fourteen (14) 500-ft wells; radiant flooring; a green roof; a solar wall and a grey water recycling system.